The duration of a planned campaign.
| Fields | |
|---|---|
 | 
                
                  
                   Date range of the campaign. Dates are in the yyyy-mm-dd format and inclusive. The end date must be < 1 year in the future and the date range must be <= 92 days long. This field cannot be combined with the duration_in_days field.  | 
              
 | 
                
                   
 The duration value in days. This field cannot be combined with the date_range field.  |